सूत्रbook
Machining & fabrication

From plate to part, on one thread

Job shops and fabricators live between raw steel, outside plating, and a customer who calls about his brackets.

Your pipeline, watched end to end

A purchase raises stock. A run eats it, stage by stage. Ready goods rise. A dispatch takes them out. Nobody types a number.

Purchase GRN in
MS Plate 5mm 500380380380 500 kg on hand
Bracket 3in 00200140 200 pc ready
Sale Dispatch

GRN-0042 — 500 kg plate received against PO-0017PRD-0001 running — the run eats plate as it cuts200 brackets packed — ready stock rises on its ownDSP-0007 — 60 pc dispatched against SO-0021 GRN-0042 — 500 kg plate received against PO-0017

A production run eating plate and making parts — the real screen.

A production run eating plate and making parts — the real screen.

The pain

Material at the plater is invisible

The answer

A job worker is a warehouse — your steel stays in your stock, on a challan, with the one-year clock watched.

Job work →
The pain

Which press made the batch that failed?

The answer

Every run can name its machine; every breakdown is a period in a log the floor writes.

Machines →
The pain

Offcuts and rejects vanish

The answer

Scrap names a defect, rejects go to a real quarantine shelf, and both reach the books.

Quality →
On your floor, it looks like this

200 brackets to Sharma Plating on JWC-0001. Five come back spoiled: the plated 195 now cost metal + plating, the five post as a loss under the plater’s name, and ITC-04 has both challan numbers.

And the small money too

Not everything is production. Diesel for the genset, chai for the floor, freight, repairs, the electrician's visit — every spending lands in the books with a category, so month-end explains itself.

⛽ Diesel ☕ Tea & coffee 🚚 Freight 🔧 Repairs 💡 Electricity 📦 Packing material

Ask us about your exact setup