सूत्रbook
Plastics & moulding

Granules, machines and cycle honesty

Moulders live by the machine: which press ran, how long it was down, and what the rejects cost.

Your pipeline, watched end to end

A purchase raises stock. A run eats it, stage by stage. Ready goods rise. A dispatch takes them out. Nobody types a number.

Purchase GRN in
PP granules 500380380380 500 kg on hand
Crates 00200140 200 pc ready
Sale Dispatch

GRN-0093 — 500 kg granules in against PO-0041M-2 moulding — granules fall shot by shot200 crates packed — regrind counted, not hiddenDSP-0044 — 60 crates dispatched GRN-0093 — 500 kg granules in against PO-0041

Machines and time lost, with reasons — the real screen.

Machines and time lost, with reasons — the real screen.

The pain

A press down is money burning

The answer

The operator logs the stoppage from the floor — hours by machine and by cause, planned service kept apart.

Machines →
The pain

Regrind and rejects

The answer

Scrap with reasons, quarantine for suspect lots, and losses that reach the books with names.

Quality →
The pain

Granules by the kg, parts by the piece

The answer

Each item in its own unit and decimals; the recipe converts between them.

Items →
On your floor, it looks like this

PRESS-2 down at 10:40 — power cut. Running by 13:10: 2½ hours in the log, written by the operator standing there, and the month’s report keeps it apart from the booked service.

And the small money too

Not everything is production. Diesel for the genset, chai for the floor, freight, repairs, the electrician's visit — every spending lands in the books with a category, so month-end explains itself.

⛽ Diesel ☕ Tea & coffee 🚚 Freight 🔧 Repairs 💡 Electricity 📦 Packing material

Ask us about your exact setup